It’s been a few days since I posted a video, so I thought I’d better do a walkthrough, and snap some pictures along the way. They have pretty much buttoned up the entire house now, with the exception of the garage door and the windows across the back of the basement. It feels much more secure and much more weather resistant.
We’ve had a finished roof for 6 days now, so the crew went to work wrapping the house, then getting the windows and doors in. We also had a shower and tub delivery, which forced us to make a decision on some Master Bath items like the shower and tub. I’ll do a follow up post on those, be we had great success through a single website.
Here’s A Video Of The Progress
Here’re Some Photos of the Progress
Kids Bathtub – Lasco Super Core 2603 sg scrbi
Master Closet on the Left, Master Bath on the Right
1st Floor Shower – Lasco Super Core 1483-ossclbi